Petawawa Research Forest
Facilities and Equipment
Buildings – Equipment – Labs – Offices
A range of equipment, laboratories, and office space are potentially available for use at the PRF. Below is a sample list:
Facilities
- 279 m2 office building with a 65 m2 dry lab for sample preparation and computer workstations
- 558 m2 heated workshop with mechanical and carpentry equipment for building or repairing field equipment or plot markers
- a pesticide storage building
- a vault building holding data records back to the 1900's
- an additional 837 m2 of unheated storage and workshop space
Equipment
- drying ovens
- field instruments
- forestry measuring instruments
- grinding mills
- pickets and field markers
- sample containers
- scales
Further details can be obtained by contacting the Forest Operations Manager (parbour@nrcan.gc.ca).